FS19 – Vestas Windturbine V5.1 Final






Vestas Windturbine V5.1 Final mod for FS19.
Hello, today I would like to introduce you to a Vestas wind turbine.
She comes from the LS15. The system was equipped with LS19 standard functions. Compared to the original of the LS15 I also exchanged the sound.
Price: 1.500.000 €
Maintenance costs: 500 € per day
Power: 2000kw
Revenue per hour: 2000 € (easy), 1500 € (normal), 1000 € (difficult)
The windmill is paid on the difficulty level “easy” after 32 days, on “normal” after 42 days and on “heavy” after 62 days, and then earns profit.
It is my first mod, so I would be happy about possible suggestions for improvement in the comments!!

Changes in V5.1 Final:
-New store picture
-i3d file was cleaned up

A big thank you to Kyosho, who gave me permission to upload this mod, as well as to Ifko [nator], who allowed me to use his script “AddStoreCategory” !!

Credit(s):
Modell: Kyosho, Giants
Textur: Kyosho, FSven, Giants
Script: Giants
Idee / Konzept: Kyosho, Giants, FSven
Tester: FSven
Sonstige: Ifko[nator] FSven

File Detail: 6.9 MB / ZIP
DOWNLOAD MOD (Mirror Server #1) Report Post

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *